Logistics / 2023
Primeline Logistics, Unit 3 Ashbourne Business Park, Rath, Co. Meath, A84 YY02
Solar panel design and installation at Primeline Logistics, Unit 3.
Tell us about a similar project
Solar panels
What WRB installed.
Solar panel system design and installation.
327.38 kWpSystem size
873Solar panels
3 × 100 kWInverters
Your project
